Background

Australia’s Greenhouse and Energy Minimum Standards (GEMS) Act 2012 establishes a national framework for appliance and equipment energy efficiency, setting minimum efficiency standards and labelling requirements to reduce energy consumption.

In December 2025, the Energy and Climate Change Ministerial Council agreed to introduce minimum energy performance (MEPS) requirements for heat pump water heaters (HPWH) following their consideration of the Decision Regulation Impact Statement (DRIS).

Exposure Draft Consultation

We’re now seeking your feedback on the exposure draft determination which will implement the Energy and Climate Change Ministerial Councils’ decision to introduce MEPS for HPWHs. The exposure draft guidance document and explanatory statement provides further information on the intent of the determination.

This exposure draft was developed following previous engagement with industry and key stakeholders.

Feedback is requested by Monday, 5 October 2026.

Online Forum

We are holding an online forum for Australian stakeholders to provide feedback at 10am-11am (AEST) on 22 September 2026. To receive an invite to this online forum please register here.

The E3 Program

This work is being progressed through the Equipment Energy Efficiency (E3) Program. The E3 Program is a collaboration between the Australian Government, states and territories of Australia, and the New Zealand Government to improve the energy efficiency and energy performance of appliances and equipment.

Please contact us if you have any questions.

Have your say

To have your say:

  • read the Heat Pump Water Heaters: Exposure Draft to Introduce Minimum Energy Performance Standards

  • provide your feedback by uploading your submission.

Submissions are due by 11.59pm (AEDT) on Monday, 5 October 2026.

Current consultation

  • Opened
    open

    6 September 2026

  • Closes
    pending

    5 October 2026

Consultation process timeline

  • Consultation Regulation Impact Statement consultation
    closed
  • Decision Regulation Impact Statement approved
    closed
  • Technical Paper consultation
    closed
  • Exposure Draft consultation
    current

    September-October 2026

  • Feedback implemented into the determination
    pending

    Quarter 3 2026

  • Determination published
    pending

    TBA